AltaGas

Alta Gas required a concrete block containment wall around the exterior of the piping and bullet vessels, as well as foundation for the bullet vessels. Once the foundations and bullet vessels were in place we did some grading for drainage into a 10ft deep concrete sump. To make things safer on this job we did some ground work and created a big pit for the vessels to flow into in case there was a leak or spill.